And here is the addition at lockup stage. These pictures were taken yesterday. The windows and doors are in, and the rooms inside are taking shape. Here’s a quick look around.
Here is the exterior at lock up stage.
This will be the new entrance to the hall. The existing stairs will come straight down from the existing building to the new.
This is inside the future Youth / Multipurpose room.
Here are a few of our future Sunday School rooms.
And finally, the entrances to the future Toddler and Baby Nurseries.
admin construction, photograph
Wow, a lot has been happening on site. Just not so much here! We’re now at lock up stage and working on interior framing, plumbing, and electrical. We are also getting close to having the the rooftop HVAC units installed. Here are a series of pictures on the way to lock up. We’ll post some further pictures of the interior and exterior shortly.
Thanks for following our progress.


To date we’ve gathered groups of volunteers to install the rigid insulation in the basement, install the vapour barrier and wire mesh on the floor and put up the last of the plywood on the exterior walls. We’re looking forward to more volunteer work in the future.




admin construction, photograph