Love the Orange

June 5th, 2009

It sure looks like a construction site now. The wonderful orange security fencing has been installed.

All the cedar siding has now been removed as well.

Lastly, here’s a shot of the basement entrance roof being unattached.

It’s been encouraging to have an active construction site. The excavation will begin shortly.

admin construction, news, photograph ,

Tree Removal

June 2nd, 2009

Today at the church there were some trees removed, and the shed was relocated. This was done to prepare the site for the upcoming excavation. The last of the lumber was also delivered today.

trees and shed
Site work today. The shed will end up along the Domano side of the church

Next up for the site will be setting up the security fencing. Once that nice orange fence is up the real work will begin.

admin construction, news, photograph , ,

Soil Testing

May 22nd, 2009

We had equipment working at the expansion site today. Two test holes were dug so that engineers can confirm the ability of the soil to support the new structure. We’ve been told to expect the results of the test by the end of next week.

While we wait we are in the process of having the gas meter moved, moving the storage shed, and hopefully some excavation. Once the test results are back the forms for the footings can be built.


soil test hole

admin construction, news, photograph

It begins

May 12th, 2009

Today the first, albeit small, step took place on the construction site. There were 3 lifts of lumber dropped off that will be used to construct the forms for the foundation. As of today we are expecting the excavation to begin in one week!

lumber drop

admin construction, photograph